SC TRANSAVIA SA, in accordance with art. 26 alin. (1) of H.G. no. 878/2005 regarding public access to environmental information, we bring the following to your attention:
Field of activity: poultry farming, which takes place in accordance with the provisions of the following authorizations:
Authorizations
| No. | Workplace name | Integrated environmental authorization | Issue date | Water management permit | Issue date |
|---|---|---|---|---|---|
| 1 | Farm no. 2 Oiejdea, Alba County | AB 5 | 30.10.2017 | 134 | 23.04.2025 |
| 2 | Farm No. 3 Sântimbru, Alba County | AB 4 | 30.10.2017 | 149 | 07.05.2025 |
| 3 | Farm No. 4 Sântimbru, Alba County | AB 10 | 11.12.2017 | 144 | 06.05.2025 |
| 4 | Farm no. 5 Galda de Jos, Alba County | AB 7 | 06.11.2017 | 159 | 15.05.2025 |
| 5 | Farm No. 6 Unirea II, Alba County | AB 8 | 13.11.2017 | 206 | 18.06.2025 |
| 6 | Farm no. 7 Pâclișa, Alba County | AB 6 | 30.10.2017 | 78 | 14.03.2025 |
| 7 | Farms No. 20 and 21 Sântimbru, Alba County | AB 3 | 26.07.2019 | 408 | 09.12.2021 |
| 8 | Farm No. 24 Lunca Mureșului, Alba County | AB 1 | 01.27.2021, updated on 03.15.2023 | 105 | 23.03.2022 |
| 9 | Farm no. 1 Cristian, Sibiu County | SB 01 |
24.10.2016
|
SB 93 | 23.08.2017 |
| 10 | Farm No. 9 Miercurea Sibiului, Sibiu County | SB 01 | 03.02.2020, revised on 04.14.2025 | 148 | 17.06.2024 |
| 11 | Farm No. 17 Mediaș, Sibiu County | SB 01 |
04.10.2013
|
235 | 19.09.2024 |
| 12 | Farm No. 8 Gligorești, Cluj County | 10 | 08.01.2017, updated as of August 23, 2024 | 55 | 03.03.2025 |
| 13 | Farm No. 15S1 Bocșa, Caraș-Severin County | 4 | 21.08.2017 | 140 | 23.06.2026 |
| 14 | Farm No. 15S2 Bocșa, Caraș-Severin County | 2 | 27.03.2017 | 267 | 08.12.2023 |
| 15 | Farm No. 18 Bocșa, Caraș-Severin County | 4 |
02.07.2018
|
91 | 28.04.2025 |
| 16 | Farm no. 19 Bocșa, Caraș-Severin County | 01 | 20.02.2019 | 213 | 15.09.2025 |
| 17 | Farm no. 22 Bocșa, Caraș-Severin County | 1 | November 3, 2021, Rev. 1 – October 24, 2023 | 138 | 03.06.2024 |
| 18 | Farm No. 23 Bocșa, Caraș-Severin County | 02 | 25.05.2015, rev. 1 – 03.10.2022 | 139 | 23.06.2026 |
| 19 | Farm No. 16 Jebel, Timiș County | 16 | 10.05.2018 | 178 | 29.09.2023 |
| 20 | Farm no. 10 Cristuru Secuiesc, Harghita County | SB 137 | 10/29/2012, updated on 07/26/2019, rev. 1 – 06/30/2021 | 98 | 15.03.2022 |
| 21 | Farm No. 25, 26, 27 Brașov, Brașov County | 07 BV | 11/05/2018, transfer decision 25/T/08/03/2022 | 131 | 10/15/2021, transfer 724/T10/TB/07/26/2022/AA |
| 22 | Farm no. 28 Codlea, Brașov County | BV 01 | 09.04.2024 | 01 | 03.01.2024 |
| 23 | Farm No. 29 Bod, Brașov County | BV 5 | 08/26/2016, amendment decision 30M/10/15/2018, transfer decision 22/T/08/03/2022, R1 – 05/31/2024 | 132 | 15.10.2021, transfer 722/T09/TB/26.07.2022/AA |
| 24 | Farm no. 30 Hălchiu, Brașov County | BV 4 | 06.06.2018, transfer decision 24/T/03.08.2022 | 74 | June 17, 2021, transfer 726/T13/TB/26.07.2022/AA |
| 25 | Farm No. 31 Satu Nou, Brașov County | BV 5 | 06.06.2018, transfer decision 26/T/03.08.2022 | 76 | 22.06.2021, transfer 725/T12/TB/26.07.2022/AA |
| 26 | Farm No. 32 Cărpiniș, Brașov County | BV 4 | 01.08.2016, amendment decision 23M/03.08.2018, transfer decision 23/T/03.08.2022, R1 – 30.05.2024 | 73 | 16.06.2021, transfer 723/T11/TB/26.07.2022/AA |
Raw materials complying with best practices are used within the work points, both in terms of quantities and storage methods. All necessary measures are taken regarding the reception, unloading, storage, and delivery of raw materials and auxiliary materials to prevent negative environmental impacts, air, soil, surface water, and groundwater pollution, as well as odors and noise.
Environmental factors (air, water, soil) are permanently monitored at the appropriate frequency by means of the internal laboratory, and once a year intercomparison is performed with an accredited laboratory and through external accredited laboratories, in accordance with the requirements of the integrated environmental permit.
The management of the generated waste complies with legal provisions, the waste is selectively stored and disposed of or recovered through authorized companies, in this regard, based on concluded collaboration contracts.
Within the company, we have established and maintained an Environmental Permit Management System (EPMS) that evaluates all operations and will review all accessible options for the use of cleaner technology, cleaner production, waste prevention and/or minimization, and efficient energy use.
The company periodically reports to the competent environmental protection authorities the results of its environmental emission monitoring activities and other relevant information, in accordance with the regulatory acts under which it operates and in compliance with the applicable environmental legislation.
During this quarter, for the monitored environmental factors, no exceedances of the emission limit values for the pollutants established in the integrated environmental authorizations and water management authorizations were recorded.